Project Description
Emergency Dam Stabilization & Support
Work Included |
- Stabilizing the existing dam structure under concern of imminent danger of major storm surge breach
- Clearing and relieving emergency spillway structure
- Freeing existing sluice gate assembly of accumulated storm debris
- Creating heavy equipment roadways for access and maintenance
- Assisting above-ground and underwater engineering consultants and governing agencies
- Replacing existing street-width asphalt roadway
- Designing and fabricating custom debris guards for existing overflow piping structures
- Stabilizing existing bridge structure
- Stabilizing existing heavily eroded dam faces with new vegetation and concrete-reinforced soil and oversized stone aggregate
- Replacing existing stormwater management structures and piping to relieve storm surge
- Other associated work necessary to render the dam stable and public thoroughfares operational
|
Owner |
Contact Name: Mr. Gregory Poff, Deputy Director
Address: College Lake; Lakeside Drive; Lynchburg, VA 24501 |
Design Engineer |
Keith Thompson, Wiley Wilson |
Contract Date |
August 2018 |
Type of Work |
Stormwater Control |
Cost of Work |
- Included under the 2018 Municipal Construction Contract for the City of Lynchburg
- Total Contract amount of $1,027,000.00
|